Terminal 3

Harry Reid International Airport

Project Details

ROLE
General Contractor

CONTRACT AMOUNT
$1.2 Billion

OWNER
Clark County Department of Aviation

LOCATION
Las Vegas, NV

ARCHITECT
PGAL

SIZE
1.9 Million Square Feet

COMPLETION
2012

Project Description

The 14-gate Terminal 3 includes a new terminal building with an elevated roadway structure fronting the facility, over-roadway pedestrian bridges, underground automated transit system infrastructure, and an aircraft ramp. The terminal has its own retail concessions, parking and ticketing.

The 1,900,000-square-foot terminal building includes a basement, three upper levels and roof-level penthouses. The building houses a baggage handling system for outbound and inbound processing, and an in-line explosives detection system for baggage screening. The building’s infrastructure is designed with extensive cabling for software interfaces. Other features include dynamic and static signage, way finding systems and Voice-over-Internet Protocol (VoIP). The elevated roadway extends the length of the terminal – approximately 90 feet wide and 2,000 feet long. Construction of the elevated roadway includes a concrete box girder with cast concrete columns.

Awards

2012 Project of the Year - Nevada Contractors Association & AGC

2013 Honor Award Winner - National Terrazzo & Mosaic Association, Inc.

2013 Merit Award for Architecture - AIA Nevada

“Perini's detailed planning, coordination and teamwork were essential to the successful completion of the quality facility that Terminal 3 is.”
Rosemary A. Vassiliadis
Director of Aviation
McCarran International Airport